The court ruling which validated the claim of the Department of Natural and Environmental Resources (DRNA) regarding the illegal occupation of protected lands in Jobos Bayin Salinaswill give way to an execution process that could last for years, acknowledged the secretary Anais Rodriguez Vega.
The head of the DRNA indicated that compliance with the ruling of the Guayama Court must wait for the ruling to become “final and firm,” which would mean the conclusion of any appeal process. She indicated that the defendants have 30 days, from Tuesday’s decision, to request a review of the sentence.
“I would love for (the eviction) to be able to (start immediately). But the order is clear and there are rights of the other parties that must be respected. “This sentence is a clear example that the system works.”expressed Rodriguez Vega.
According to the ruling, he said, the DRNA has ample margin to define how the restoration works would be carried out, the cost of which, as well as the removal of structures from the protected area, must be assumed by the defendants.
“There are several actions that must be taken to carry out the restoration, which is what we want, at the end of the day, to achieve. The sentence does not give instructions on how this process will be carried out.. But, certainly, the order is clear. The first thing is that they have to evacuate immediately and, together with the DRNA, begin the demolition process, whether of permanent structures or those that are not necessarily permanent,” said Rodriguez Vega.
The DRNA has estimated the cost of infrastructure removal and environmental restoration at $4 million.
“There, there are people occupying (the nature reserve at present). In fact, there are even short-term unit rentals. “I can assure you that we will comply with the court’s order.”he insisted.
Comply with the sentence, admitted Rodriguez Vega, It will not be a simple process, particularly when analyzed in light of other environmental controversies whose resolution has taken years..
In it Sun and Beach condominiumin CornerFor example, the Aguadilla Court ordered, in February 2022, the demolition of a wall illegally built in the terrestrial maritime zone. However, the demolition of the structure – built to protect a recreational area – began in October 2023, almost 20 months later, after an extensive judicial process that included multiple resignations of the members of the condominium board of directors who were in charge of enforce the sentence.
Rodriguez Vega emphasized that The Bahia de Jobos controversy is more complex by, among other elements, the number of parties that appear in the lawsuit and the cost of returning the estuarine reserve to its natural state.
“Everyone saw the cost that (the removal of) a fence would have. If we extrapolate that to structures, docks where piles have to be removed, which require a special permit, we can estimate that the cost could be around those numbers ($4 million).. We are talking about many more people. “I hope and trust that there is compliance with the order,” she stressed.
The DRNA specified that, at the end of the process, 22 parties were included as defendants in the appeal that led to the judge’s ruling. Jose D’Anglada Raffucci.
“In general terms, in Puerto Rico, there is a serious serious oversight problem, even in the context in which there are already rulings issued by the court or the agencies themselves. Many times, there is clear non-compliance with the law and a lack of express oversight of the agencies, because functions are delegated arbitrarily and in a circular manner.”commented, meanwhile, the environmental lawyer Omar Saadewho described as “positive” that the sentence includes an environmental restoration component.
Although the DRNA managed to prove the illegal occupation of Bahia de Jobos and the environmental damage, Rodriguez Vega mentioned that “evaluations” must still be carried out on the scope of elements such as land filling, sediment deposits and the cutting of mangroves..
“As has happened in other cases, such as in Sol y Playa, it was the DRNA that established the restoration plan. The party proposes and the DRNA accepts or does not accept the plan,” he said.
“It will depend on the proportion of the impact on the components of the natural system. Recover the biodiversity It may be the most difficult, but it depends on how the ecological niche of those species was impacted.. On other occasions, in the event that there is contamination of the land, decontamination can be the most difficult,” said the environmental planner. Jose “Tato” Rivera Santana.
The potential delay in restoration work could complicate that objective, in the event that “some damage continues,” he warned. “There is the possibility that environmental damage will spread and, the longer it lasts, the more impact it will have”stressed Rivera Santana.