:format(jpeg)/cloudfront-us-east-1.images.arcpublishing.com/gfrmedia/TV6TU64PIRHYHP4LBFTRMXU37E.jpeg)
Students of the Luis Felipe Crespo High School, in Camuy, They denounced on Wednesday, through a video published on the social network TikTokthe deplorable conditions in which several of the campus bathrooms are locatedand, although the publication implies that the school began the semester under these conditions, the Public Buildings Authority (AEP) and the Education deparment They stressed that the campus was delivered in optimal conditions and that the situation is due to acts of vandalism.
In the one-minute publication, the students showed that in the bathrooms The doors of several cubicles were missing, while others had their doors locked with padlocks. In addition, they showed broken sinks without water service, a lack of toilet paper, destroyed soap dispensers, a lack of mirrors, walls with profane and defiant messages such as “if they repaint it, I will rewrite it,” and floors with stains. and garbage. The images generated a wave of reactions and indignation among social media users.
During the afternoon of Thursday, in another video posted on TikTokstudent Aleisha Torreswho identified herself as president of a graduating class and who participated in the original viral video, denounced that the school administration retaliated against her class by allegedly denying them the celebration of fundraising activities.
Furthermore, the young woman assured that, although the bathrooms were fixed after her complaints, it was the first time in three years that they were enabled. She reported that, yesterday, upon returning from an excursion with her group, they were detained to prevent them from crossing paths with press personnel who, at that time, were visiting the premises to document the situation.
However, the school director, Judith Nievesand the regional director of the Regional Educational Office (ORE) of Arecibo of the Department of Education, Paula Rodriguez, denied the student’s statements and indicated that the bathrooms are in good condition. In addition, Nieves rejected retaliation against the graduating class after the publication of Wednesday’s video.
Regarding the alleged retaliation, Nieves explained that “on February 6, a school council meeting was held in which the student Ricardo Ramos submitted a request to carry out activities. Three were approved casual days (in which students can attend school in casual clothing) and what was left pending were the dates. Two teachers requested permission to hold two activities that the previous principal signed off on, but they did not appear before the school board, the rules were not followed. So we talked to the teachers and (the activities) were cancelled.”
Nieves highlighted that Ramos did not communicate the school board’s decisions to the students, which created confusion, while he categorically rejected retaliation against the students.
“We do not retaliate against students who exercise their right to express themselves”Rodriguez added.
Regarding the complaint that they were not allowed to get off the bus that took them back after participating in a field trip To prevent them from speaking with members of the press who, presumably, visited the school, Rodriguez clarified that there were no journalists on the premises.
“Upon returning to school, we began to unload students in an orderly manner. Those who had to go to the library were, as were the students who had their practice periods, and students who also requested to go to the bathroom. At no time were they prevented from getting off the bus,” Nieves stressed.
Meanwhile, Rodriguez clarified that what the students confused as “members of the press” were Communications personnel from the Department of Education who accompanied her during a series of visits to schools in San Juan.
“I made a series of visits to schools in San Juan, and when I found out about the situation (in Camuy), I decided to go to the school to check what was happening. The staff present were not members of the press, but rather staff from the Education Communications team who accompanied me on the visits (to the schools in San Juan)”Rodriguez stressed.
The Regional Director of the ORE of Arecibo explained that the campus was delivered, by AEP personnel, on January 20 in optimal conditions. She added that the process of painting the school, which consists of three floors and which she described as “large”, began in September of last year and that all precautions were taken not to affect the student body during the work.
“I visited the school today, from 7:45 am, I toured the campus and the bathrooms were in order. Yes, there was a closed bathroom and it was ordered to be opened. The school has a total of six bathrooms; two on each floor. I checked and all the bathrooms had toilet paper, soap and drinking water (in the faucets, urinals and toilets), Rodriguez stated.
He added that in Wednesday’s video, the student turns on the hot water faucet, which is not active. She also highlighted that these are of automatic design (which cut off the water flow after several seconds) and that you have to press firmly, downward, to activate.
“Yes, some walls were written with messages that cannot be published and there was torn paint, but that torn paint was the new paint (from work that began in September 2023), and what is shown below was the color of the previous painting. The bathrooms had water service”Nieves said.
Regarding the cubicle for people with disabilities that appeared in the video with a padlock, Rodriguez explained that it was closed because it was used to store the cleaning materials that continued to arrive at the campus from the painting and remodeling work that began in September. “But the material has already been removed and the lock on that cubicle has been removed.”
Finally, Rodriguez said that brigades visit schools through itineraries with pre-established dates, and that said maintenance work is carried out throughout the year.
Nieves differed from Torres’ assessment by highlighting that “there were brigades yesterday (Wednesday) and there were brigades today (Thursday). But they were there as part of the dates set for maintenance work and not because a video was posted on TikTok. They were there yesterday, they were there today and they will continue to come to provide maintenance,” Nieves stressed.
“Everything is in optimal conditions, everything is organized,” he emphasized.
For his part, the executive director of the AEP, Mr. Yamil Ayala Cruzreacted to the controversy and indicated, through written statements, that, in reality, the images disseminated “They are evidence of acts of vandalism carried out after the completion of the completed works” on the campus that receives over 600 students.
Besides, in another video provided to El Nuevo Dia by the AEP During an inspection of the school’s bathrooms after the improvements were completed, it was observed up close that several of the urinals were covered by beverage cans and milk packets from those served to students in the dining room.
Ayala Cruz assured that, after the complaints about the video, personnel from the AEP checked and repaired the damaged plumbing, doors and bathrooms, and indicated that the Education deparment will carry out cleaning and replacement of paper and soap dispensers.
In addition, Francisco Cruz Riveraexecutive director of the Office of Public School Improvement (OMEP), whose staff was also present on campus, confirmed to The new day that All the sinks were left in operation and with water service, as were the fountains, and the cubicle doors were repaired.
“Everything they (the students) broke, we fixed it again,” said Cruz Rivera.
The AEP, in charge of maintaining the infrastructure of the school in question, assured that By January 20 of the current year, the school campus was fully painted and equipped for the beginning of the semester. The official also stated that all the necessary works were completed in these facilities. with an investment of $782,651.53.
For his part, the mayor of Camuy, Gabriel “Gaby” Hernandezreacted to the controversy and assured that the video published by the students “created an erroneous perception about the infrastructure and painting conditions of the school campus.”
“I recognize that there is a bathroom that needs some repairs, but it is important to say that as recently as January 20, the AEP completed a painting and improvement project, and “He delivered the campus to the school community in good condition.”stated the municipal executive in written statements.
Hernandez added that in the coming days work will begin to remodel the school field after the allocation of funds for said work.
For his part, the spokesman for the Education deparment, Alexis Ramos, detailed that there is an auction in process, for $2 million, to carry out additional infrastructure improvements at the school. He also detailed that there are currently a total of eight bathrooms on campus, of which two are under repair.
