Responding to recent questions from the Puerto Rico Energy Bureau (NEPR) on the increasing rates of service interruptions that were recorded in fiscal year 2023-2024, LUMA Energy He insisted that the combination of various natural phenomena and the historical deterioration of the electrical grid have prevented it from reducing both the duration and frequency of blackouts.
“LUMA continues to make progress in conditions that continue to deteriorate,” the consortium said in response to NEPR’s request for information, specifically in response to the question of why last fiscal year Customers experienced, on average, 19% more time without power that in 2022-2023.
“The infrastructure for which LUMA is responsible continues to suffer the effects of decades of under-maintenance and under-investment, as well as five declared disasters in the past eight years”the company added.
According to LUMA, between July 2023 and June 2024, there were 59 blackout events associated with “extreme weather,” which was 33% more than in the previous 12 months, producing “incremental impacts on an already highly fragile system.”
Specifically, throughout the last fiscal year, LUMA subscribers suffered an average of 1,448 minutes (24 hours and eight minutes) without electricity due to breakdowns in the transmission and distribution networkwhich is managed by the consortium. In the previous fiscal year, that metric – known by its acronym in English as SAIDI – was 1,218 minutes (20 hours and 18 minutes). The SAIDI for 2023-2024 was also higher than the fiscal year 2020 SAIDI of 1,243 minutes (20 hours and 43 minutes), which the NEPR uses as a basis for measuring LUMA’s performance.
LUMA became operational in June 2021, so 2023-2024 was its third full year in charge of the network.
Last year, in turn, the SAIFI – index of frequency of interruptions per client – also registered an increase, from Seven to eight events per subscriber. As part of its response to the NEPR request, LUMA essentially pointed to the same factors that explain the increase in SAIDI: problems with vegetation on power lines; damage to equipment such as conductor cables, insulators, switches and transformers; and breakdowns in transmission lines and substations.
“In fiscal year 2024, there was a significant increase in T&S (transmission and substation) events, with an increase of 14% compared to the previous year.. While a significant portion of these events were short-lived (less than 15 minutes), these events tend to impact a large number of customers,” LUMA noted in the document, submitted to the NEPR on August 30.
In the case of vegetation, LUMA reported that the frequency of “events” increased by 40% compared to 2022-2023directly causing a 300-minute increase in SAIDI. The difference occurred despite the fact that the consortium annually allocates nearly $50 million of its operational budget to routine maintenance work on vegetation around the power lines.
Last summer, LUMA kicked off the effort to clear vegetation beneath the 16,000 miles of transmission and distribution lines, but so far, it has only succeeded in getting the Federal Emergency Management Agency –which finances the initiative– approve one of more than 30 projects in which the work is subdivided, amid questions about environmental management. According to LUMA, the clearing project must be completed by 2027, reducing service interruptions by 45%, although the company’s president, Juan Sacarecently acknowledged that There is uncertainty about that deadline.
On the other hand, in response to NEPR’s questions about the “significantly higher” levels of SAIDI that were recorded in five districts – Barranquitas, Caguas, Guayama, Utuado and Vega Baja – in June of this year, LUMA replied that looking at data for a specific month, rather than longer-term trends, “can be misleading due to seasonal impacts in Puerto Rico.”
“Service reliability is typically analyzed on a multi-year basis to determine meaningful trends, given the variation in weather and other external factors experienced throughout the year.”LUMA said.
For all five operational districts, however, the consortium identified the same three factors – vegetation, damaged equipment and transmission and substation failures – as drivers of the increase in outages.
Answer from LUMA Energy to NEPR, August 30