They urge state and federal governments to harmonize their agendas for electrical reconstruction

They urge state and federal governments to harmonize their agendas for electrical reconstruction

If Puerto Rico does not find a way to optimize the reconstruction of its electrical system in the short term, it not only runs the risk that projects financed with federal funds dilate, but would remain tied for a long time to the fossil fuels on which your current depends generating fleet and would face a scenario of “defection” of customers from the core network that would cause dramatic increases in rates within the next five years, the study concluded. Center for a New Economy (CNE) in its most recent publication.

“Part of the problem is precisely that each entity is focusing on a limited area of ​​the problem and there is no agency or entity, right now, that is looking at the interconnection between all of these projects.”. When we talk about the reconstruction or transformation of the system, there are four or five projects that are running simultaneously,” said the director of Public Policy Analysis of the study group, Sergio Marxuachin reference to the repair works of the electrical lines, the transition to the renewable sources and the decision to privatize operations through contracts of LUMA Energy and Generate PRwithout the expected results having been produced so far.

Kumneger Media
Kumneger Media
Kumneger Media is a News and Entertainment Website & Channel. Kumneger Media in addition to News and Entertainment it is the hub of Politics, Movies, Drama, Music, Comedy, Documentary and More!