How long will it take to repair the fault in the Superaqueduct?

How long will it take to repair the fault in the Superaqueduct?

What began as the repair of a break in a 72-inch line of the Superaqueduct became this Friday a more complex intervention for the Aqueduct and Sewer Authority (AAA), after the brigades identified a second point of interest that could extend the time necessary to normalize the drinking water service.

The first repair could take between 12 and 16 hoursbut the executive director of the AAA, Luis Gonzalez Delgadorecognized that There is still no final restoration estimate because the second leak remains under evaluation.

The repair work began in the early hours of Friday, after the flow of water produced in the filter plant was interrupted. Antonio Santiago Vazquezin Arecibo, to allow work on the riverbed Bayamon.

According to Gonzalez Delgado, the initial intervention consists of repairing a joint that connects 72-inch pipes. However, This time could be extended depending on the magnitude of the second point identified during the work.

Kumneger Media
Kumneger Media
Kumneger Media is a News and Entertainment Website & Channel. Kumneger Media in addition to News and Entertainment it is the hub of Politics, Movies, Drama, Music, Comedy, Documentary and More!