After freezing the rate for up to three additional months electrical energyhe Puerto Rico Energy Bureau (NEPR) issued a request for information aimed at knowing if LUMA Energybetween June and August, fulfilled his obligation to order Generate PR use the most economical generation units in the fleetthus minimizing fuel purchase costs.
On Monday, the NEPR denied the request for an increase that LUMA presented in September, which would have had an impact of more than 12% on residential customers – who currently pay 23.99 cents per kilowatt hour – under the premise that the consortium had not submitted enough information to justify the adjustment.
“LUMA did not establish the sequence or order of dispatch of the generators, nor how the previously projected dispatch was affected as a result of the service interruptions during the period from June to August 2024, which is essential to determine whether the increases in “expenses incurred in the purchase of fuel were prudent and reasonable”the NEPR stressed in the request it released on Tuesday.
Although Genera PR operates the generating fleet and is responsible for purchasing fuel, it is LUMA Energy, as operator of the transmission and distribution system, who decides which units should dispatch energy, using the cost of electrical production as the main criterion. In this analysis, LUMA must prioritize the most economical units, which are usually the largest of the different plants.
Most rapid response units – which are turned on when base plant breakdowns occur or demand increases – use diesel, which is usually a more expensive fuel than diesel. natural gas or bunker C.
“If it is demonstrated that there were lower cost units that were not used, the Energy Bureau will not pass on these additional costs to consumers”added the organization.
The deficiency that LUMA reported between fuel purchase costs and consumption income from June to August exceeded $111 milliona margin that LUMA attributed to high temperatures – which triggered consumption –, breakdowns in several Genera PR units and “inefficiencies” in plant production.
In accordance with the NEPR requirement, LUMA will have until October 8 to answer the questions. In the order, the NEPR announced that, once the responses are received, it will schedule a hearing.
“The Energy Bureau emphasizes that the classification of an expense as prudent or reasonable, including fuel purchase charges, is not automatic, nor is the authorization for its inclusion in the bill, but requires evaluation and approval by the Energy Bureau under the criteria of prudence and reasonableness,” said the energy sector regulator.