The rescue operation for workers trapped in a tunnel in India enters the “final phase”

The rescue operation for workers trapped in a tunnel in India enters the “final phase”

New Delhi – The operation to rescue 41 workers who were trapped 12 days ago in a tunnel under construction in northern India entered its “final phase” this Thursday, after the authorities claimed to have overcome one of the last obstacles that they faced. separated from the workers.

“I am pleased to report that all the steel that was obstructing the free movement of the pipe inside has now been removed. We are trying to move six meters ahead of the 45-metre mark, which we have already reached,” special duty officer for the tunnel project, Bhaskar Khulbe, told the media.

This progress was reported after, on Wednesday night, drilling towards the place where the workers are trapped was stopped by an iron obstruction.

“We hope there are no more obstacles in our path ahead,” he added.

A makeshift hospital with 41 beds, doctors, support teams, 41 ambulances, and helicopters wait outside the tunnel in the town of Silkyara, in the northern state of Uttarakhand, with the hope that the operation will be successfully completed this Thursday.

The head of government of Uttarakhand, Pushkar Singh, assured media from the field that the rescue is in “its final phase.”

The workers were trapped in the early hours of November 12 when a section of a tunnel under construction collapsed, causing a blanket nearly 60 meters thick.

The rescuers have been in contact with the workers since the day of the collapse using walkie-talkies, and provide them with food and oxygen thanks to a narrow pipe that was already present before the accident.

The rescue plan consisted of creating a cavity in the rubble wall large enough to insert a pipe almost a meter in diameter through which the workers could exit.

As space is opened with tunnel boring machines, sections of pipe of about six meters each are introduced, while expert welders join each end. At least 45 meters of pipe have been inserted so far.

Until Wednesday at midnight, authorities estimated that about 10 meters separated them from those trapped. According to rescue technicians, cited by Indian media, the auger used for the excavation is capable of drilling about 3 meters of debris in an hour if there are no setbacks.

Kumneger Media
Kumneger Media
Kumneger Media is a News and Entertainment Website & Channel. Kumneger Media in addition to News and Entertainment it is the hub of Politics, Movies, Drama, Music, Comedy, Documentary and More!