:format(jpeg):focal(2111x1648:2121x1638)/cloudfront-us-east-1.images.arcpublishing.com/gfrmedia/TJZ2MCL62NBUXJ3I7AKKM7GJWE.jpg)
Lime — The concessionaire of the trains that go to the famous Inca citadel of Macchu Picchu announced on Monday that it suspended its operations for two days after several landslides caused by rain affected the railway over the weekend, leaving two people missing and 17 affected.
In a statement, Ferrocarril Trasandino indicated that due to the “stone and earth slides” it estimates that it will take two days to rehabilitate the railway. Earlier, the director of the Risk Management office of the Cusco region, Miguel Oscco, told local radio RPP that two people were reported missing.
Oscco explained that the two missing people were residents, a 54-year-old man and a 12-year-old teenager. “It is a transit area because it is a route that goes from Machu Picchu to a hydroelectric plant,” he commented.
Another 17 people were left with blows to various parts of their bodies after the avalanche and were treated at a nearby health center, Oscco said. The train leaves from Cusco and travels 70 kilometers to reach Machu Picchu.
The rainy season in Machu Picchu, Peru’s tourist magnet, occurs between December and April, while the dry season is between May and November.
The Inca citadel was built in the 15th century as a religious sanctuary of the Incas and is located in the Amazon of southeastern Peru at an altitude of 2,490 meters.
